Industrial Buildings

For Strabag a.s. (2016 – present) – technical coordination and consulting   

  • BLIZZARD ŽEBRÁK – EAME OVERHAUL PRODUCT CENTER (floor area 18 000 m2) – consulting and technical coordination Test Cells construction

 Projects (2010 – 2012)

  • Lego Kladno Future Development – (floor area 40 000m2) – Kladno, Project Management

For TAKENAKA EUROPE GmbH  (2002 – 2007) – Construction Management

  • Donaldson Factory II – extension of the production plant (floor area 10 500 m2) – Klášterec nad Ohří – preparation phase of the project
  • Toyota Parts Center Czech Republic – warehouse center (floor area 14 200 m2) – Krupka
  • Donaldson Factory – manufacturing plant (floor area 12 800 m2) – Kadaň
  • AYOAMA – manufacturing plant (floor area 17 500 m2) – Lovosice
  • NACHI Fujikoshi Factory – manufacturing plant (floor area 5500 m2) – Louny
  • IMC Factory – manufacturing plant (floor area 2500 m2) – Louny
  • Modifications and extensions of already existing production plants ABC, ABL – Louny

Comments are closed.